dc.contributor.author | Elçi, Ali Fırat | en_US |
dc.contributor.author | Çakır, Volkan | en_US |
dc.date.accessioned | 2019-10-29T17:48:44Z | |
dc.date.available | 2019-10-29T17:48:44Z | |
dc.date.issued | 2018 | |
dc.identifier.issn | 2169-8767 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12294/1936 | |
dc.description | Çakır, Volkan (Arel Author), Elçi, Ali Fırat (Arel Graduate Student) | en_US |
dc.description | 2nd European International Conference on Industrial Engineering and Operations Management.IEOM 2018 -- 26 July 2018 through 27 July 2018 -- | en_US |
dc.description.abstract | Combined heat and power systems also known as trigeneration and cogeneration systems are capable of providing electricity, heating and cooling powers using one fuel simultaneously. Natural gas, biogas and landfill gas can also be used as fuel for these systems. Natural gas is the most popular power source that is used in trigeneration systems and common fuel in the Turkish market due to its accessibility and sustainability. Trigeneration system projects are complex and require interdisciplinary engineering study and coordination. An active and effective project management is requirement because of high initial investment costs. In general, one can say that a project is successful if requirements are met on schedule within budget and delivers a good return on investment. In today's competitive market failures such as project delays or excessive budget use are not uncommon but costly. Though management of risk associated with these failures are the main concern of a successful project manager. In traditional project management, whole project consists of independent processes where no interaction exists. However, as projects get complicated and larger this assumption needs to be reconsidered. System dynamics approach can be an alternative solution by its ability in understanding interactions and its feedback structures. In this research, the factors that affect budget and timeliness of trigeneration system projects is analyzed using system dynamics. Alternative scenarios are developed and reduction of gap between planned and realized budget and schedule target are examined. It is showed that developed model can be used by project managers as a decision support system. © IEOM Society International. | en_US |
dc.language.iso | eng | en_US |
dc.publisher | IEOM Society | en_US |
dc.relation.ispartof | Proceedings of the International Conference on Industrial Engineering and Operations Management | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Project management | en_US |
dc.subject | System dynamics | en_US |
dc.subject | Trigeneration | en_US |
dc.title | Analysis of project profitability and schedule overruns using system dynamics, a case study of trigeneration system | en_US |
dc.type | conferenceObject | en_US |
dc.department | İstanbul Arel Üniversitesi, Mühendislik-Mimarlık Fakültesi, Endüstri Mühendisliği Bölümü. | en_US |
dc.identifier.volume | 2018 | en_US |
dc.identifier.issue | JUL | en_US |
dc.identifier.startpage | 2741 | en_US |
dc.identifier.endpage | 2742 | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.department-temp | Elci, A.F., Institute of Sciences, Istanbul Arel University, Istanbul, Turkey; Cakir, V., Industrial Engineering Department, Istanbul Arel University, Istanbul, Turkey | en_US |